Liquefaction assessment of a thickened tailings deposit in an arid environment using empirical approaches and critical state laboratory testing to calibrate cone penetration tests
A case study of a liquefaction assessment undertaken on a thickened tailings deposit at a copper mine in an arid environment is presented. A program was undertaken that consisted of cone penetration tests with pore pressure measurement (CPTu), with variable rate penetration testing, and specialist critical state laboratory tests, with the objective of estimating undrained shear strengths and potential for cyclic liquefaction to occur under the design earthquake. During the CPTu program, the results were analysed to assess zones where the tailings provided low penetration resistance, generally indicative of looser tailings than adjacent depth intervals. At these locations, multiple piston-tube tailings samples were collected for laboratory tests allowing calibration of the field results. It was found that current available methods applied to the CPTu to infer the in-situ state parameter did not provide reasonable results, in particular for estimation of in situ strength of the tailings, and hence they could not be applied to the tailings studied. Nevertheless, the testing gave insight to the behaviour of the tailings and the estimates of the normalised dimensionless penetration rate of the cone indicated that undrained conditions controlled the shear behaviour of the tailings. Therefore, the method proposed by Robertson (2009) using Nkt method was found to provide a reasonable estimate of the tailings undrained shear strength in the TSF, with comparisons to laboratory testing showing good agreement.
About the speaker
Brad Tiver Senior Tailings Engineer, Golder
Brad is a Senior Tailings Engineer in Golder’s Adelaide office and has been at Golder for 10 years since graduating from University of Adelaide. He has broad experience designing tailings storage facilities and project management. He is the key contact in Adelaide for tailings management for BHP at Olympic Dam, OZ Minerals and SIMEC’s operation in the Southern Middleback Ranges,.
His tailings experience includes site options assessments; scoping studies; laboratory testing programs; geotechnical and hydrogeological investigations at brownfield and greenfield mine sites; and the design and analysis of tailings storage facilities from concept design through to detailed design and permitting. Brad has been project manager and also been part of project teams on a wide range of tailings projects and commodities, predominantly in South Australia, for iron, copper, gold and graphite.
This video is only available for AGS Members
Engineers Australia members participating in AGS technical sessions can record attendance on their personal CPD logs. Members should refer to Engineers Australia CPD policy for details on CPD types, requirements and auditing guidelines.