Managing Geotechnical Risk in Sydney’s Road Tunnel Projects

Peter Ng

The construction of road tunnels in urban environments like Sydney presents significant geotechnical challenges. Effective management of these risks is crucial to ensure the safety, stability, and success of such projects. This presentation explores the various geotechnical risks associated with Sydney’s road tunnel projects, including ground conditions, water ingress, and the impact on existing infrastructure. It delves into advanced techniques and methodologies employed to mitigate these risks, such as thorough site investigations, real-time monitoring, and adaptive engineering solutions. By examining case studies and best practices, this presentation aims to provide a comprehensive understanding of how to manage geotechnical risks effectively, ensuring the delivery of safe and efficient tunnel projects in Sydney.

Peter Ng Geologist, John Holland Group

Peter is a Chartered Engineer with over 17 years of expertise in geotechnical engineering and contract management. His extensive experience spans road header, drill and blast tunneling, Earth Pressure Balance (EPB), Slurry Shield tunneling, pipe-jacking, excavation, and lateral support (ELS). Additionally, he excels in slope maintenance and ground investigation. Peter’s career encompasses both contractor and consultant roles, covering site management, design, tender bidding, contract administration, and project delivery. His proven ability to deliver innovative, value-engineered solutions at all project stages underscores his commitment to excellence and innovation in the engineering field.

Engineers Australia members participating in AGS technical sessions can record attendance on their personal CPD logs. Members should refer to Engineers Australia CPD policy for details on CPD types, requirements and auditing guidelines.