Mt Barker Road Project Visit
Andrew Campbell
This meeting involved a visit to the South Eastern Freeway project and a talk by Andrew Campbell from Maunsell who is involved with the geotechnical design on the project. The visit and the talk covered all aspects of the project including the design and stabilisation of the rock slopes between the Tollgate and Crafers, the tunnel and the Clarendon Fault.
Engineers Australia members participating in AGS technical sessions can record attendance on their personal CPD logs. Members should refer to Engineers Australia CPD policy for details on CPD types, requirements and auditing guidelines.