The role of testing for pile design in Australia

ABSTRACT This presentation examines some implications of the recent (2009) edition of the Australian Piling Standard (AS2159) on the design of piles in Australia. The relative benefits of static and dynamic testing are reviewed and their contribution to reliability is assessed and compared with partial factors recommended by AS2159 (2009). Information from a range case …more

Posted in 2014 SA Meetings, Meeting, South Australia and NT |

Pile testing at the Superway

ABSTRACT The South Road Superway is a 4.8 kilometre non-stop corridor with a 2.8 kilometre elevated roadway between the Port River Expressway and Regency Road in Adelaide, South Australia. It is the largest road project ever undertaken in South Australia. The elevated roadway is a 50 span viaduct, 42 of whose spans are 60m long …more

Posted in 2014 SA Meetings, Meeting, South Australia and NT |

Seismic Upgrade of Hindmarsh Valley Dam

Posted in 2014 SA Meetings, Meeting, South Australia and NT |